Gondo is a 57MW hydro power project. It is located in Valais, Switzerland. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1952.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 57 57 Active Valais, Switzerland

Description

Alpiq Holding, EnAlpin, EnBAG and FMV are currently owning the project having ownership stake of 81.9%, 10.79%, 3% and 2.7% respectively.

Gondo is a reservoir based project. The gross head of the project is 470m. Gondo underwent through rehabilitation & modernization during 2012-2017. The project generated 198 GWh of electricity.

The hydro power project consists of 2 turbines.

The hydro power project consists of 1 turbine with 18.68MW nameplate capacity.

The project has 1 electric generator installed at the site. The generator capacity is 25 MVA.

Development Status

The project got commissioned in 1952.

Contractors Involved

Indar Electric supplied 1 electric generator for the project. The generator capacity is 25 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.