Grand Tower Plant – Frankfort Line is a 345kV overhead line with a length of 65.98km from Grand Tower Plant, Illinois, US, to E. W. Frankfort, Illinois, US.
The project, which is currently under construction, is expected to be commissioned in 2021.
Description
Grand Tower Plant – Frankfort Line is an overhead line that will be operated by Ameren Missouri. The line will carry alternating current (AC) through double circuit cable.
The development of the Grand Tower Plant – Frankfort Line project has been approved by the Illinois Commerce Commission.
Grand Tower Plant – Frankfort Line project development status
The construction works on the Grand Tower Plant – Frankfort Line project commissioning is expected in 2021.
About Ameren Missouri
Ameren Missouri (Ameren Missouri) that designs and builds regional transmission projects. The company is headquartered in St. Louis, Missouri, United States.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.