Greenway Renewable Power Plant is a 50MW biopower project. It is located in Georgia, the US. The project is currently active. It has been developed in single phase.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Biopower 50 50 Active Georgia, the US Rollcast Energy

Description

The project is developed and owned by Rollcast Energy.

The project supplies enough clean energy to power 13,000 households. The project cost is $150m.

The process of combustion has been adopted in this project to release the stored energy from the feed. Wood waste which is a kind of wood by-product is used as a feedstock to power the project.

Power Purchase Agreement

Georgia Power and Mas Energy are the power offtakers from the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.