Greifenstein is a 293MW hydro power project. It is located on Danube river/basin in Lower Austria, Austria. The project is currently active. It has been developed in single phase. The project construction commenced in 1981 and subsequently entered into commercial operation in 1985.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 293 293 Active Lower Austria, Austria

Description

The project is currently owned by VERBUND Hydro Power with a stake of 100%.

Greifenstein is a run-of-river project. The gross head of the project is 12.6m. The project generated 1,752.805 MWh of electricity.

Development Status

The project construction commenced in 1981 and subsequently entered into commercial operation in 1985.

Contractors Involved

Andritz Hydro was selected as the turbine supplier for the hydro power project. The company provided 9 units of kaplan turbines.

Andritz Hydro supplied electric generator(s) for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.