The Halyard Wharton Energy Center is 354MW gas fired power project. It is planned in Texas, the US. The project is currently in permitting stage. It will be developed in multiple phases. Post completion of the construction, the project is expected to get commissioned in 2021.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 354 | – | 354 | Permitting | Texas, the US | Halyard Energy Ventures |
---|
Description
The project is being developed and currently owned by Halyard Energy Ventures.
It is a gas turbine power plant.
The thermal power project will consists of 2 turbines each with 177 MW nameplate capacity.
Development Status
Post completion of the construction, the project is expected to get commissioned in 2021.
Contractors Involved
Lauren Engineers & Constructors is expected to render EPC services for the gas fired power project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.