Hierro Wind Project is a 41.58MW onshore wind power project. It is located in Castile and León, Spain. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 2019.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Onshore | 41.58 | 41.58 | – | Active | Castile and León, Spain | Naturgy Renovables |
---|
Description
The project is developed and owned by Naturgy Renovables.
The project generates 148,243MWh electricity thereby offsetting 39,049t of carbon dioxide emissions (CO2) a year. The project cost is $91.476m.
The project has 114m high towers.
Development Status
The project is currently active. The project got commissioned in 2019.
Contractors Involved
Siemens Gamesa Renewable Energy was selected as the turbine supplier for the wind power project. The company provided 12 units of G132-3.465 MW turbines, each with 3.465MW nameplate capacity.
About Naturgy Renovables
Naturgy Renovables SL (Naturgy Renovables) generates, transmits, and distributes electricity through solar energy. Naturgy Renovables headquartered in Spain.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.