Huadian Zibo Cogeneration Plant is a 950MW coal fired power project. It is located in Shandong, China. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in August 2003.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 950 | 950 | – | Active | Shandong, China |
---|
Description
The project is currently owned by Huadian Power International with a stake of 100%.
It is a Steam Turbine with Cogen power plant.
Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase I Unit I) consists of 1 steam turbine with 145MW nameplate capacity.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project got commissioned in August 2003.
Contractors Involved
SEPCOIII Electric Power Construction was selected to render EPC services for the Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase II Unit I) project. SEPCOIII Electric Power Construction was selected to render EPC services for the Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase II Unit II) project.
Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase I Unit II) is equipped with Harbin Turbine steam turbine. The phase consists of 1 steam turbine with 145MW nameplate capacity.
Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase II Unit I) is equipped with DEC Dongfang Steam Turbine CC330 / 263-16.7 / 1.0 / 0.5 / 537/537 steam turbine. The phase consists of 1 steam turbine with 330MW nameplate capacity.
Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase II Unit II) is equipped with DEC Dongfang Steam Turbine CC330 / 263-16.7 / 1.0 / 0.5 / 537/537 steam turbine. The phase consists of 1 steam turbine with 330MW nameplate capacity.
DEC Dongfang Electric Machinery supplied QFSN-330-2-20B electric generator for the Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase II Unit I).
DEC Dongfang Electric Machinery supplied QFSN-330-2-20B electric generator for the Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase II Unit II).
Harbin Boiler supplied steam boiler for the Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase I Unit I).
Harbin Boiler supplied steam boiler for the Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase I Unit II).
Dongfang Boiler Group supplied steam boiler for the Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase II Unit I).
Dongfang Boiler Group supplied steam boiler for the Huadian Zibo Cogeneration Plant (Huadian Zibo Cogeneration Plant Phase II Unit II).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.