Irkutsk Thermal Power Station-9 is a 540MW coal fired power project. It is located in Irkutsk, Russia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 1958 and subsequently entered into commercial operation in May 1963. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Irkutsk Thermal Power Station-9

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Irkutskenergo with a stake of 100%.

It is a Steam Turbine with Cogen power plant that is used for Baseload. The fuel is procured from Coal of Azeisk deposit.

Development status

The project construction commenced in 1958 and subsequently entered into commercial operation in May 1963.

Contractors involved

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit I) is equipped with Leningradsky Metallichesky Zavod PT-60-130/13 steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit II) is equipped with Leningradsky Metallichesky Zavod PT-50-130/13 steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit III) is equipped with Leningradsky Metallichesky Zavod P-50-130/13 steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit IV) is equipped with Leningradsky Metallichesky Zavod P-50-130/13 steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit V) is equipped with Ural Turbine Works T-60/65 -130 steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit VI) is equipped with Ural Turbine Works T-60/65 -130 steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit VII) is equipped with Ural Turbine Works T-100/120-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit VIII) is equipped with Ural Turbine Works R-100-130/15 steam turbine. The phase consists of 1 steam turbine with 100MW nameplate capacity.

NPO Elsib supplied TV-60-2, Hydrogen Cooled electric generator for the project.

NPO Elsib supplied TV-60-2, Hydrogen Cooled electric generator for the project.

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the project.

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the project.

For more details on Irkutsk Thermal Power Station-9, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.