Irkutsk Thermal Power Station-9 is a 540MW coal fired power project. It is located in Irkutsk, Russia. The project is currently active. It has been developed in multiple phases. The project construction commenced in 1958 and subsequently entered into commercial operation in May 1963.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 540 540 Active Irkutsk, Russia

Description

The project is currently owned by Irkutskenergo with a stake of 100%.

It is a Steam Turbine with Cogen power plant that is used for Baseload. The fuel is procured from Coal of Azeisk deposit.

Development Status

The project construction commenced in 1958 and subsequently entered into commercial operation in May 1963.

Content from our partners
How Hengst helped to keep Germany’s charity “star singers” shining
How one power station prevented frequent shutdowns with three-stage air filtration
Reimagining the carbon problem

Contractors Involved

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit I) is equipped with Leningradsky Metallichesky Zavod PT-60-130/13 steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit II) is equipped with Leningradsky Metallichesky Zavod PT-50-130/13 steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit III) is equipped with Leningradsky Metallichesky Zavod P-50-130/13 steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit IV) is equipped with Leningradsky Metallichesky Zavod P-50-130/13 steam turbine. The phase consists of 1 steam turbine with 50MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit V) is equipped with Ural Turbine Works T-60/65 -130 steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit VI) is equipped with Ural Turbine Works T-60/65 -130 steam turbine. The phase consists of 1 steam turbine with 60MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit VII) is equipped with Ural Turbine Works T-100/120-130 steam turbine. The phase consists of 1 steam turbine with 110MW nameplate capacity.

Irkutsk Thermal Power Station-9 (Irkutsk Thermal Power Station-9 Unit VIII) is equipped with Ural Turbine Works R-100-130/15 steam turbine. The phase consists of 1 steam turbine with 100MW nameplate capacity.

NPO Elsib supplied TV-60-2, Hydrogen Cooled electric generator for the project.

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Wednesday. The power industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU