Jaworzno III Power Plant is a 1,343.5MW coal fired power project. It is located in Silesia, Poland. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in May 1977.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,343.5 | 1,343.5 | – | Active | Silesia, Poland |
---|
Description
The project is currently owned by TAURON Wytwarzanie.
It is a steam turbine with cogen power plant.
Jaworzno III Power Plant (Jaworzno Power Plant II) consists of 2 steam turbines.
Development Status
The project got commissioned in May 1977.
Contractors Involved
Jaworzno III Power Plant (Jaworzno Power Plant III) is equipped with GE Power 13 CK 70 steam turbines. The phase consists of 6 steam turbines.
Sumitomo SHI FW Energia supplied steam boiler for the Jaworzno III Power Plant (Jaworzno Power Plant II).
Rafako supplied steam boiler for the Jaworzno III Power Plant (Jaworzno Power Plant III).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.