Karkheh I is a 400MW hydro power project. It is located on Karkhe river/basin in Khuzestan, Iran. The project is currently active. It has been developed in single phase. The project construction commenced in 1988 and subsequently entered into commercial operation in 2002.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 400 400 Active Khuzestan, Iran Iran Water and Power Resources Development

Description

The project is developed and owned by Iran Water and Power Resources Development. The company has a stake of 100%.

Karkheh I is a reservoir based project. The hydro reservoir capacity is 7,300 million cubic meter. The gross head and net head of the project are 106.5m and 93m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 3 in number. The penstock diameter is 6.2m. The project generated 934 GWh of electricity.

Development Status

The project construction commenced in 1988 and subsequently entered into commercial operation in 2002.

How well do you really know your competitors?

Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.

Company Profile – free sample

Thank you!

Your download email will arrive shortly

Not ready to buy yet? Download a free sample

We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form

By GlobalData
Visit our Privacy Policy for more information about our services, how we may use, process and share your personal data, including information of your rights in respect of your personal data and how you can unsubscribe from future marketing communications. Our services are intended for corporate subscribers and you warrant that the email address submitted is your corporate email address.

Contractors Involved

Farab was selected to render EPC services for the hydro power project.

Harbin Turbine was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 133.3MW nameplate capacity.

Andritz Hydro supplied 3 electric generators for the project.

About Iran Water and Power Resources Development

Iran Water and Power Resources Development Co (IWPC) is an energy company that develops and operates power generating, water transfer and pump storage projects. The company provides activities such as preparing, operating and developing hydropower generating facilities and structures; preparing and implementing national projects in the fields of providing and transferring water and pump-storage facilities and structures. IWPC also offers services such as rendering project management services in the fields of hydropower plants facilities; feasibility studies for hydropower projects and others. IWPC is headquartered in Tehran, Iran.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.