Kavsak Bendi is a 191MW hydro power project. It is located on Seyhan river/basin in Adana, Turkey. The project is currently active. It has been developed in multiple phases. The project construction commenced in 2008 and subsequently entered into commercial operation in 2013.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 191 191 Active Adana, Turkey Enerjisa Enerji Uretim

Description

The project is developed and owned by Enerjisa Enerji Uretim.

The hydro reservoir capacity is 30 million cubic meter. The gross head and net head of the project are 85.5m and 84.81m respectively.

Development Status

The project construction commenced in 2008 and subsequently entered into commercial operation in 2013.

How well do you really know your competitors?

Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.

Company Profile – free sample

Thank you!

Your download email will arrive shortly

Not ready to buy yet? Download a free sample

We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form

By GlobalData
Visit our Privacy Policy for more information about our services, how we may use, process and share your personal data, including information of your rights in respect of your personal data and how you can unsubscribe from future marketing communications. Our services are intended for corporate subscribers and you warrant that the email address submitted is your corporate email address.

Contractors Involved

Kavsak Bendi (Kavsak Bendi I) is equipped with GE Renewable Energy francis turbines. The phase consists of 3 turbines with 62MW nameplate capacity.

Kavsak Bendi (Kavsak Bendi II) is equipped with CKD Blansko Small Hydro francis turbine. The phase consists of 1 turbine with 5.715MW nameplate capacity.

GE Renewable Energy supplied 3 electric generators for the Kavsak Bendi (Kavsak Bendi I).

TES Vsetin supplied 1 electric generator for the Kavsak Bendi (Kavsak Bendi II). The generator capacity is 6.39 MVA.

About Enerjisa Enerji Uretim

Enerjisa Enerji Uretim AS (Enerjisa Enerji), is an energy utility company. The company generates electricity from lignite coal, hydro, natural gas and wind sources. It owns and operates wind plants such as Canakkale in Mahmudiye, Dagpazari in Mut, and Balikesir in Balikesir province; Tufanbeyli lignite power plant in Tufanbeyli; hydroelectric power plants such as Dagdelen, Kusakli, Cambasi, Yamanli II, Menge, Sariguzel, Hacininoglu, Kopru, Kavsak bendi, Kandil, Arkun among others; and natural gas plants such as Kentsa, Bandirma II, and Bandirma I in Bandirma and Kocaeli. The company invests in the development of various power projects in the country. Enerjisa Enerji is headquartered in Istanbul, Turkey.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.