Kharanorskaya Thermal Power Plant is a 655MW coal fired power project. It is located in Zabaykalsky Krai, Russia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 1995. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Kharanorskaya Thermal Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Inter RAO UES with a stake of 100%.

It is a Steam Turbine with Cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is coal. In case of shortage of coal the plant can also run on Fuel Oil. The fuel is procured from Urtuysky Coal Mine, Kharanorskiy 2B and 3B Quarries, CJSC Irkutsknefteprosukt, LLC Magnatek.

The project generated 3,611,480MWh of electricity.

Development status

The project got commissioned in October 1995.

Contractors involved

EnergoProekt and LLC Inter Rao Engineering were selected to render engineering procurement construction services for the Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit III).

Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit I) is equipped with Leningradsky Metallichesky Zavod K-215-130-1 steam turbine. The phase consists of 1 steam turbine with 215MW nameplate capacity.

Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit II) is equipped with Leningradsky Metallichesky Zavod K-215-130-1 steam turbine. The phase consists of 1 steam turbine with 215MW nameplate capacity.

Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit III) is equipped with Power Machines K-225-12,8-3R steam turbine. The phase consists of 1 steam turbine with 225MW nameplate capacity.

Elektrotyazhmash-Privod supplied TGV-200-2MUZ electric generator for the Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit I).

Elektrotyazhmash-Privod supplied TGV-200-2MUZ electric generator for the Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit II).

Power Machines supplied TZFP-220-2U3 electric generator for the Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit III).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit I).

Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit II).

EnergoMashinostroitelny Alliance supplied steam boiler for the Kharanorskaya Thermal Power Plant (Kharanorskaya Thermal Power Plant Unit III).

For more details on Kharanorskaya Thermal Power Plant, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.