Kurakhivska Thermal Power Plant is a 1,532MW coal fired power project. It is located in Donetsk, Ukraine. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in November 1972.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Thermal | 1,532 | 1,532 | – | Active | Donetsk, Ukraine |
---|
Description
The project is currently owned by DTEK Energy with a stake of 100%.
It is a steam turbine with cogen power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is coal. In case of shortage of coal the plant can also run on Natural Gas.
The project generated 5,969,400MWh of electricity.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project got commissioned in November 1972.
Contractors Involved
Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit I) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 200MW nameplate capacity.
Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit II) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 210MW nameplate capacity.
Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit III) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 222MW nameplate capacity.
Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit IV) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 225MW nameplate capacity.
Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit V) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 225MW nameplate capacity.
Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit VI) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 225MW nameplate capacity.
Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit VII) is equipped with Ukrainian Energy Machines K-300-240 steam turbine. The phase consists of 1 steam turbine with 225MW nameplate capacity.
Electrotyazhmash supplied TGV-200 electric generator for the project.
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit I).
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit II).
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit III).
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit IV).
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit V).
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit VI).
Taganrog Boiler-Making Works Krasny Kotelshchik supplied steam boiler for the Kurakhivska Thermal Power Plant (Kurakhovska Thermal Power Plant Unit VII).
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.