La Grande-1 is a 1,436MW hydro power project. It is located on La Grande river/basin in Quebec, Canada. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1994.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 1,436 | 1,436 | – | Active | Quebec, Canada | Societe d’energie de la Baie James |
---|
Description
The project was developed by Societe d’energie de la Baie James and is currently owned by Hydro-Quebec.
La Grande-1 is a run-of-river project. The net head of the project is 27.5m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 12 in number.
Development Status
The project got commissioned in 1994.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
The turbines for the hydro power project have been supplied by Andritz Hydro and GE Renewable Energy.
GE Renewable Energy supplied electric generator(s) for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.