Laforge-2 is a 319MW hydro power project. It is located on Laforge river/basin in Quebec, Canada. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1996.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 319 | 319 | – | Active | Quebec, Canada | Societe d’energie de la Baie James |
---|
Description
The project was developed by Societe d’energie de la Baie James and is currently owned by Hydro-Quebec.
Laforge-2 is a run-of-river project. The hydro reservoir capacity is 1,840 million cubic meter. The net head of the project is 27.4m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 2 in number.
Development Status
The project got commissioned in 1996.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataContractors Involved
GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 2 units of kaplan turbines, each with 159.5MW nameplate capacity.
GE Renewable Energy supplied 2 electric generators for the project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.