Laguna Lake-Bay Solar PV Park is a 126MW solar PV power project. It is planned in Calabarzon, Philippines. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in December 2025.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 126 | – | 126 | Permitting | Calabarzon, Philippines | Barracuda Energy |
---|
Description
The project is being developed and currently owned by Barracuda Energy.
Laguna Lake-Bay Solar PV Park is a ground-mounted solar project.
The project cost is expected to be around $177.03m.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by December 2025.
About Barracuda Energy
Barracuda Energy Corp (Barracuda Energy) specializes in installation ,development and construction of a solar park. It is headquartered in Philippines.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.