Lanco Kondapalli Combined Cycle Power Plant is a 1,476.14MW gas fired power project. It is located in Andhra Pradesh, India. The project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in October 2000.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Thermal 1,476.14 1,476.14 Active Andhra Pradesh, India

Description

The project is currently owned by Lanco Kondapalli Power with a stake of 100%.

It is a combined cycle gas turbine (ccgt) power plant. The fuel is procured from GAIL (India) Limited, Reliance Industries Limited.

Development Status

The project got commissioned in October 2000.

How well do you really know your competitors?

Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.

Company Profile – free sample

Thank you!

Your download email will arrive shortly

Not ready to buy yet? Download a free sample

We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form

By GlobalData
Visit our Privacy Policy for more information about our services, how we may use, process and share your personal data, including information of your rights in respect of your personal data and how you can unsubscribe from future marketing communications. Our services are intended for corporate subscribers and you warrant that the email address submitted is your corporate email address.

Power Purchase Agreement

The power generated from the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I) is sold to Transmission Corporation of Andhra Pradesh under a power purchase agreement for a period of 15 years. The contracted capacity is 368.14MW.

Contractors Involved

Lanco Infratech was selected to render EPC services for the gas fired power project.

Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 128.99MW nameplate capacity.

Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I) is equipped with GE Power 9E.03 gas turbines. The phase consists of 2 gas turbines with 119.577MW nameplate capacity.

Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II) is equipped with GE Power Frame 9FA gas turbine. The phase consists of 1 gas turbine.

Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II) is equipped with Harbin Electric Multi casing Design Condensing steam turbine. The phase consists of 1 steam turbine.

Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I) is equipped with GE Power 9FA gas turbine. The phase consists of 1 gas turbine with 241MW nameplate capacity.

Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I) is equipped with Harbin Electric Multi casing Design Condensing steam turbine. The phase consists of 1 steam turbine with 130MW nameplate capacity.

Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II) is equipped with GE Power 9FA gas turbine. The phase consists of 1 gas turbine with 241MW nameplate capacity.

Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II) is equipped with Harbin Electric Multi casing Design Condensing steam turbine. The phase consists of 1 steam turbine with 130MW nameplate capacity.

GE Power supplied electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I).

Harbin Electric supplied Air-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II).

GE Power supplied Hydrogen-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II).

Harbin Electric supplied Air-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I).

GE Power supplied Hydrogen-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I).

Harbin Electric supplied Air-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II).

GE Power supplied Hydrogen-Cooled electric generator for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II).

Hanjung Power supplied steam boiler for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase I).

Thermax supplied steam boiler for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase II).

Thermax supplied steam boiler for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block I).

Thermax supplied steam boiler for the Lanco Kondapalli Combined Cycle Power Plant (Lanco Kondapalli Combined Cycle Power Plant Phase III Block II).

Genting Lanco Power (India) is the O&M contractor for thermal power project.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.