Laval de Cere is a 96MW hydro power project. It is located on Ruisseau de Candes river/basin in Nouvelle-Aquitaine, France. The project is currently active. It has been developed in single phase. The project construction commenced in 1932 and subsequently entered into commercial operation in 1967.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 96 | 96 | – | Active | Nouvelle-Aquitaine, France |
---|
Description
The project is currently owned by Electricite de France with a stake of 100%.
Laval de Cere is a run-of-river project. The hydro reservoir capacity is 1.8 million cubic meter. The project generated 228 GWh of electricity.
Development Status
The project construction commenced in 1932 and subsequently entered into commercial operation in 1967.
Contractors Involved
GE Renewable Energy was selected as the turbine supplier for the hydro power project.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.