LILO of Kosamba – Chorania Line is a 400kV overhead line with a length of 89km from Kosamba, Gujarat, India, to Chorania at Sanand II, Gujarat, India.

Construction works on the LILO of Kosamba – Chorania Line project was commissioned in 2018.

Description

The LILO of Kosamba – Chorania Line, which is an overhead line, is being operated by Gujarat Energy Transmission. The LILO of Kosamba – Chorania Line is a new line. The line carries alternating current (AC) through double circuit cable.

LILO of Kosamba – Chorania Line project development status

The development of the LILO of Kosamba – Chorania Line project was approved by Gujarat Electricity Regulatory Commission and the project works were completed in 2018.

About Gujarat Energy Transmission

Gujarat Energy Transmission Corporation Ltd (GETCL) is a state government company that carries out production and distribution of electricity. The company’s activities include replacement of equipments of all voltage class, augmentation of substation capacity, procurement of testing equipments and replacement of conductor, insulators, earth wire and line materials. It operates transmission circle offices in Ichhapur, Balitha, Navsari, Bharuch, Jambuva and Koyali. GETCL is headquartered in Vadodara, Gujarat, India.

Methodology

All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.