Lugo – Victorville Line is a 500kV overhead line with a length of 24.9km from Lugo, California, US, to Victorville, California, US.

The project, which is currently in the planning stage, is expected to be commissioned in 2022.

Description

Lugo – Victorville Line is an overhead line that will be operated by Los Angeles Department of Water and Power. The line will carry alternating current (AC) through double circuit cable.

Lugo – Victorville Line project development status

The construction works on the Lugo – Victorville Line project will be commenced in 2021 and commissioning is expected in 2022.

About Los Angeles Department of Water and Power

Los Angeles Department of Water and Power (LADWP) is a utility service provider that offers drinking water and electricity. The utility’s services include power and water supply, electric rates information, billing, water conservation, water resource planning, water quality check, groundwater replenishment, backflow prevention, environmental documentation and groundwater evaluation. It operates power projects such as Aqueduct Power Plant, Pine Tree Wind Farm Project, Citywide Underground Transmission Cable Replacement Project, Transmission Line Upgrade, GSIS Groundwater Monitoring Wells and Water Quality Improvement projects among others.

Methodology

All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.