Matli-TAY Powergen Biomass Power Plant is a 30MW biopower project. It is planned in Sindh, Pakistan. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2024.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 30 | – | 30 | Permitting | Sindh, Pakistan | Tay Powergen |
---|
Description
The project is being developed and currently owned by Tay Powergen.
The project cost is expected to be around $70.152m.
The process of combustion will be adopted in this combined heat and power (CHP) project to release the stored energy from the feed. Bagasse which is a kind of agricultural by-product will be used as a feedstock to power the project.
Development Status
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataThe project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2024.
Contractors Involved
Hangzhou Steam Turbine will be the steam turbine supplier for the project. The company is expected to provide 2 turbines, each with 15MW nameplate capacity.
Heavy Mechanical Complex (Pvt) is likely to be the supplier of the steam boiler for the project. The boiler that will get installed at the site is expected to have a capacity of 100TPH.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.