Mirovka Substation is a 400kV substation located in Mirovka, Vysocina, Czech Republic.
The Mirovka Substation project’s construction has begun in 2019. The works are expected to be commissioned in 2021.
Description
Mirovka Substation project, which is an upgrade substation, will be operated by CEPS.
The designed voltage level of the substation is 400/110kV and the operating voltage level is 400/110kV.
The step-in voltage of the project is 400kV and the step-out voltage is 110kV. Upon completion, the substation will have a capacity of 700MVA.
Mirovka Substation project development status
The development of the Mirovka Substation project was approved by The Energy Regulatory Office in 2019. The project is expected to be commissioned in 2021.
About CEPS
CEPS A.S. (CEPS) is a state-controlled electric utility that develops, operates and maintains the Czech transmission system. It is responsible for balancing the supply of electricity with demand. CEPS transmits electricity from generators to distributors in the domestic market, or exports to/imports from abroad. The company is also responsible for allocating the available transfer capacity on international cross-border power lines through auctions. Its dispatch control services include operational planning, real-time control and operational evaluation. The company is responsible for developing the transmission system to meet the future electricity demand.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.