Miyar is a 120MW hydro power project. It is planned on Miyar Nallah river/basin in Himachal Pradesh, India. The project is currently in permitting stage. It will be developed in single phase. Post completion of the construction, the project is expected to get commissioned in 2022.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 120 | – | 120 | Permitting | Himachal Pradesh, India | NTPC |
---|
Description
The project is being developed and currently owned by NTPC.
Miyar is a run-of-river project. The hydro reservoir capacity is planned to be 9 million cubic meter. The gross head and net head of the project will be 231.81m and 215.54m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 1 in number. The penstock length will be 155m. The penstock diameter will be 3.6m. The project is expected to generate 453.73 GWh of electricity. The project cost is expected to be around $171.69m.
The hydro power project consists of 3 turbines, each with 40MW nameplate capacity.
The project has 3 electric generators that will be installed at the project site.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataDevelopment Status
Post completion of the construction, the project is expected to get commissioned in 2022.
About NTPC
NTPC Ltd (NTPC) is an energy conglomerate. It has presence in the entire value chain of the power generation business. The company produces electricity and sells that to state power utilities on wholesale basis. NTPC generates electric power using the coal, gas, liquid fuel, hydro and renewable sources. It has interests in various power plants under development and implementation stages. The company also provides consultancy, project management and supervision; holds interests in coal mining blocks; and carries out energy trading, oil and gas exploration, training of power professionals, rural electrification, ash utilisation and coal mining. NTPC is headquartered in New Delhi, India.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.