Moglice is an 184MW hydro power project. It is located on Devoll river/basin in Korce, Albania. The project is currently active. It has been developed in single phase. The project construction commenced in 2015 and subsequently entered into commercial operation in 2020.

Project Type Total Capacity (MW) Active Capacity (MW) Pipeline Capacity (MW) Project Status Project Location Project Developer
Hydropower 184 184 Active Korce, Albania Devoll Hydropower

Description

The project was developed by Devoll Hydropower and is currently owned by Statkraft with a stake of 100%.

The hydro reservoir capacity is 400 million cubic meter. The gross head of the project is 300m. The project generated 450 GWh of electricity. The project cost is $471.17m.

Development Status

The project construction commenced in 2015 and subsequently entered into commercial operation in 2020.

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Contractors Involved

GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines.

GE Renewable Energy supplied 2 electric generators for the project. The generator capacity is 104.5 MVA.

Methodology

All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.