Mooroopna Solar PV Park is a 20.7MW solar PV power project. It is planned in Victoria, Australia. The project is currently in permitting stage. It will be developed in single phase. The project construction is likely to commence in 2022 and is expected to enter into commercial operation in 2023.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Solar PV | 20.7 | – | 20.7 | Permitting | Victoria, Australia | Akuo Energy Pacific; GVCE Mooroopna Solar |
---|
Description
The project is being developed by Akuo Energy Pacific and GVCE Mooroopna Solar. These companies also have ownership stakes in the project.
Mooroopna Solar PV Park is a ground-mounted solar project which is planned over 30 hectares.
The project is expected to generate 39,200MWh electricity and supply enough clean energy to power 10,100 households. The project is expected to offset 42,340t of carbon dioxide emissions (CO2) a year. The project cost is expected to be around $15.86m.
Development Status
The project construction is expected to commence from 2022. Subsequent to that it will enter into commercial operation by 2023.
About Akuo Energy Pacific
Akuo Energy Pacific Pty Ltd (Akuo Energy Pacific) generates, transmits and distributes electricity through solar power plants and wind generation facilities. It is headquartered in Australia.
About GVCE Mooroopna Solar
GVCE Mooroopna Solar Pty Ltd (GVCE Mooroopna Solar) specializes in power and electricity generation, transmission, production, and distribution services. It is headquartered in the Australia.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.