Mutonga Substation is a 400kV substation located in Mutonga, Nairobi, Kenya.
The Mutonga Substation project’s construction has begun in 2020. The works are expected to be commissioned in 2021.
Description
Mutonga Substation project, which is a new substation, will be operated by Kenya Electricity Transmission.
The designed voltage level of the substation is 400/220kV and the operating voltage level is 400/220kV.
The step-in voltage of the project is 400kV and the step-out voltage is 220kV. Upon completion, the substation will have a capacity of 350MVA.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataMutonga Substation project development status
The project is expected to be commissioned in 2021. Approximately $29.23m was financed by the authorities to undertake the construction works of the project.
About Kenya Electricity Transmission
Kenya Electricity Transmission Co Ltd (KETRACO) is an electric utility company that develops electricity transmission infrastructure. The utility plans, designs, constructs, owns, operates and maintains high voltage electricity transmission grid and regional power interconnectors. Its services include the construction of transmission pylons, conductors and substations. KETRACO operates transmission lines of various capacities. It also develops a grid system to improve the quality and reliability of electricity supply, evacuates power from planned generation plants, reduces transmission losses, reduces the cost of electricity, and others.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.