Naran is an 188MW hydro power project. It is planned on Kunhar river/basin in Khyber Pakhtunkhwa, Pakistan. The project is currently in permitting stage. It will be developed in single phase. Post completion of the construction, the project is expected to get commissioned in 2022.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 188 | – | 188 | Permitting | Khyber Pakhtunkhwa, Pakistan | Pakhtunkhwa Energy Development Organization |
---|
Description
The project is being developed and currently owned by Pakhtunkhwa Energy Development Organization.
The hydro reservoir capacity is planned to be 14.636 million cubic meter. The gross head of the project will be 336m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 4 in number. The penstock length will be 100m. The penstock diameter will be 2.2m. The project is expected to generate 705.46 GWh of electricity. The project cost is expected to be around $440m.
The hydro power project consists of 4 units of francis turbines.
The project has 4 electric generators that will be installed at the project site.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalDataDevelopment Status
Post completion of the construction, the project is expected to get commissioned in 2022.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.