Areva has completed installation of equipment at the Olkiluoto 3 (OL3) EPR reactor project in Finland.

Work involved the installation of the fourth and last pump of the primary cooling system and its connection to the auxiliary piping and onsite power system.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

The current work completes the reactor’s nuclear steam supply system, which circulates water heated by the nuclear fuel.

The OL3 EPR reactor’s cooling system consists of four identical cooling loops connected to the reactor vessel, each with a steam generator, a pump and related piping.

The world’s first generation III reactor is 80% complete.

 

GlobalData Strategic Intelligence

US Tariffs are shifting - will you react or anticipate?

Don’t let policy changes catch you off guard. Stay proactive with real-time data and expert analysis.

By GlobalData

Power Technology Excellence Awards - Nominations Closed

Nominations are now closed for the Power Technology Excellence Awards. A big thanks to all the organisations that entered – your response has been outstanding, showcasing exceptional innovation, leadership, and impact.

Excellence in Action
Recognised with three 2025 Power Technology Excellence Awards, Hover Energy is at the forefront of intelligent microgrids and distributed renewables. Explore how its AI-enabled Microgrid Management System™ , strategic partnerships and networked microgrids are rebuilding the grid from the ground up for a more flexible, resilient energy future.

Discover the Impact