Areva has completed installation of equipment at the Olkiluoto 3 (OL3) EPR reactor project in Finland.
Work involved the installation of the fourth and last pump of the primary cooling system and its connection to the auxiliary piping and onsite power system.
The current work completes the reactor’s nuclear steam supply system, which circulates water heated by the nuclear fuel.
The OL3 EPR reactor’s cooling system consists of four identical cooling loops connected to the reactor vessel, each with a steam generator, a pump and related piping.
The world’s first generation III reactor is 80% complete.
How well do you really know your competitors?
Access the most comprehensive Company Profiles on the market, powered by GlobalData. Save hours of research. Gain competitive edge.
Thank you!
Your download email will arrive shortly
Not ready to buy yet? Download a free sample
We are confident about the unique quality of our Company Profiles. However, we want you to make the most beneficial decision for your business, so we offer a free sample that you can download by submitting the below form
By GlobalData