Nilo Pecanha is a 380MW hydro power project. It is located on Pirai river/basin in Rio de Janeiro, Brazil. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in 1953.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Hydropower | 380 | 380 | – | Active | Rio de Janeiro, Brazil |
---|
Description
The project is currently owned by Light Energia with a stake of 100%.
The gross head of the project is 312m.
Development Status
The project got commissioned in 1953.
Contractors Involved
Voith Hydro Holding was selected as the turbine supplier for the hydro power project.
GE Renewable Energy supplied 1 electric generator for the project. The generator capacity is 78 MVA.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.