Oradea Sud – Nadab Line is a 400kV overhead line from Oradea, Bihor, Romania, to Nadab, Arad, Romania.
Construction works on the Oradea Sud – Nadab Line started in 2019 and the project was commissioned in 2020.
Description
The Oradea Sud – Nadab Line, which is an overhead line, is being operated by Transelectrica. The Oradea Sud – Nadab Line is a new line. The line carries alternating current (AC).
Oradea Sud – Nadab Line project development status
The development of the Oradea Sud – Nadab Line project was approved by Romanian Energy Regulatory Authority in 2019 and the project works were completed in 2020.
About Transelectrica
Transelectrica SA (Transelectrica) is a transmission and system operator (TSO) of national power system in Romania. The company operates through its subsidiaries and carries out the electricity transmission, system and market operation, grid and market infrastructure development. It is also responsible for the administration of the balancing market and conducts inspections and repairs for transformers and autotransformers, electrical equipment, incident remediation and micro-production of electrical equipment; and provides telecommunication services and personal training related to energy sector. Transelectrica designs, manufactures and distributes the control equipment for power systems.
Methodology
All publicly-announced T&D Line & Substation projects included in this analysis are drawn from GlobalData’s Power IC. The information regarding the projects is sourced through secondary information sources such as country specific utility players, company news and reports, statistical organisations, regulatory body, government planning reports and their publications and is further validated through primary from various stakeholders such as power utility companies, consultants, energy associations of respective countries, government bodies and professionals from leading players in the power sector.