Pennington Biomass Power Project I is a 47.2MW biopower project. It is located in Alabama, the US. The project is currently active. It has been developed in single phase. Post completion of construction, the project got commissioned in April 1993.
Project Type | Total Capacity (MW) | Active Capacity (MW) | Pipeline Capacity (MW) | Project Status | Project Location | Project Developer | Biopower | 47.2 | 47.2 | – | Active | Alabama, the US |
---|
Description
The project is currently owned by Georgia-Pacific Consumer Products.
Pennington Biomass Power Project I is a combined heat and power (CHP) project. Wood waste which is a kind of wood by-product is used as a feedstock to power the project.
The project consists of 1 turbine with 47.2MW nameplate capacity.
Development Status
The project got commissioned in April 1993.
Methodology
All power projects included in this report are drawn from GlobalData’s Power Intelligence Center. The information regarding the project parameters is sourced through secondary information sources such as electric utilities, equipment manufacturers, developers, project proponent’s – news, deals and financial reporting, regulatory body, associations, government planning reports and publications. Wherever needed the information is further validated through primary from various stakeholders across the power value chain and professionals from leading players within the power sector.