The Albagair Combined Cycle Power Plant is 750MW oil fired power project. It is planned in Sudan. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in multiple phases. The project construction is likely to commence in 2024 and is expected to enter into commercial operation in 2025. Buy the profile here.
Description
The project is being developed and currently owned by Sudanese Thermal Power Generating.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant can run on dual-fuel. The primary fuel being used to power the plant will be heavy fuel oil/light diesel oil. In case of shortage of heavy fuel oil/light diesel oil the plant will run on Natural Gas.
Albagair Combined Cycle Power Plant (Albagair Combined Cycle Power Plant Phase I) consists of 2 gas turbines with 175MW nameplate capacity.
Development status
The project construction is expected to commence from 2024. Subsequent to that it will enter into commercial operation by 2025.
For more details on Albagair Combined Cycle Power Plant, buy the profile here.