Alvarez Condarco is a 50.7MW hydro power project. It is located on Mendoza river/basin in Mendoza, Argentina. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project commenced construction in 2002. Buy the profile here.

Description

Alvarez Condarco is a run-of-river project. The gross head of the project is 84.5m. The project generated 259 GWh of electricity.

The nameplate capacity of electric generator(s) installed at the site is 17.9 MVA.

The nameplate capacity of electric generator(s) installed at the site is 28.5 MVA.

Development status

The project commenced construction in 2002.

Contractors involved

IMPSA was selected as the turbine supplier for the hydro power project. The company provided 1 unit of francis turbine with 15MW nameplate capacity.

IMPSA was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 23.3MW nameplate capacity.

For more details on Alvarez Condarco, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.