Ashkot is a 300MW hydro power project. It is planned on Neelum river/basin in Azad Kashmir, Pakistan. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2028 and is expected to enter into commercial operation in 2031. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Data Insights Ashkot

Buy the Profile

Data Insights

The gold standard of business intelligence.

Find out more

Description

The project is being developed and currently owned by Laraib Energy.

The gross head of the project will be 117m. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, is expected to be 5 in number. The penstock length will be 267m. The penstock diameter will be 3.4m. The project is expected to generate 1,347 GWh of electricity.

The hydro power project consists of 5 turbines, each with 60MW nameplate capacity.

The project will have 5 electric generators installed at the project site. The generator capacity is likely to be 70.6 MVA.

Development status

The project construction is expected to commence from 2028. Subsequent to that it will enter into commercial operation by 2031.

Power purchase agreement

The power generated from the project will be sold to K-Electric under a power purchase agreement.

For more details on Ashkot, buy the profile here.

About Laraib Energy

Laraib Energy Ltd (LEL), a subsidiary of The Hub Power Co Ltd, is an alternative energy company that develops hydro power projects. The company constructs and develops hydroelectric and river project such as New Bong Escape Hydroelectric Power Complex. LEL's projects have been developed under build-own-operate-transfer basis. The company's project is located near the downstream of the Mangla Dam, a multi-purpose water storage project. LEL’s energy is generated by the project evacuated through an in-out connecting arrangement with the double circuit Kharian and Mangla transmission lines. The company serves across Pakistan. LEL is headquartered in Islamabad, Pakistan.

This content was updated on 14 October 2024

Data Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.