Aslancik is a 93MW hydro power project. It is located on Harsit river/basin in Giresun, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2010 and subsequently entered into commercial operation in 2014. Buy the profile here.
Description
The project is currently owned by Aslancik Elektrik Uretim ve Ticaret Ltd. Sti.
Aslancik is a run-of-river project. The gross head of the project is 134.5m. The penstock length is 238m. The penstock diameter is 4.5m. The project generated 388 GWh of electricity.
Development status
The project construction commenced in 2010 and subsequently entered into commercial operation in 2014.
Contractors involved
Vito Enerji ve Ticaret Yatirim was selected as the turbine supplier for the hydro power project. The company provided 2 units of francis turbines, each with 60MW nameplate capacity.
Vito Enerji ve Ticaret Yatirim supplied 2 electric generators for the project.
For more details on Aslancik, buy the profile here.