Aushiger is a 60MW hydro power project. It is located on Cherek river/basin in Kabardino-Balkaria, Russia. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1994 and subsequently entered into commercial operation in 2002. Buy the profile here.
Description
The project is currently owned by RusHydro with a stake of 100%.
Aushiger is a reservoir based project. The net head of the project is 93m. The project generated 240.5 GWh of electricity.
Development status
The project construction commenced in 1994 and subsequently entered into commercial operation in 2002.
Contractors involved
Power Machines was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 20MW nameplate capacity.
Power Machines supplied 3 electric generators for the project. The generator capacity is 24.1 MVA.
For more details on Aushiger, buy the profile here.