Aya HPP is a 120MW hydro power project. It is planned on Pantabangan river/basin in Central Luzon, Philippines. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2029 and is expected to enter into commercial operation in 2032. Buy the profile here.
Description
The project is being developed and currently owned by First Gen Hydro Power.
Aya HPP is a pumped storage project. The hydro reservoir capacity is planned to be 2,000 million cubic meter.
The hydro power project consists of 2 turbines, each with 60MW nameplate capacity.
Development status
The project construction is expected to commence from 2029. Subsequent to that it will enter into commercial operation by 2032.
For more details on Aya HPP, buy the profile here.
About First Gen Hydro Power
First Gen Hydro Power Corporation owns and operates 112-megawatt Pantabanga-Masiway hydroelectric power complex.