Bac Ai PSP is a 1,200MW hydro power project. It is planned in Ninh Thuan, Vietnam. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the under construction stage. It will be developed in a single phase. The project construction is likely to commence in 2020 and is expected to enter into commercial operation in 2029. Buy the profile here.
Description
The project is being developed and currently owned by Vietnam Electricity.
Bac Ai PSP is a pumped storage project. The project is expected to generate 1,759 GWh of electricity.
The hydro power project consists of 4 turbines, each with 300MW nameplate capacity.
The project has 4 electric generators that will be installed at the project site.
Development status
The project construction is expected to commence from 2020. Subsequent to that it will enter into commercial operation by 2029.
For more details on Bac Ai PSP, buy the profile here.
About Vietnam Electricity
Vietnam Electricity (EVN) is an integrated electric utility. The company generates, transmits and distributes and sells energy. It produces power from hydro, coal, oil, and gas sources. EVN operates various power plants and electricity generation companies. It operates the entire national power transmission and distribution network and controls operation of the national power system through the National Load Dispatch Center. The company imports electricity from China and Laos, and exports power to Cambodia and Laos. It operates through power generation and distribution companies in Vietnam. EVN is headquartered in Hanoi, Vietnam.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.