Baglihar is a 900MW hydro power project. It is located on Chenab river/basin in Jammu and Kashmir, India. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 1999 and subsequently entered into commercial operation in 2008. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Baglihar

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Jammu and Kashmir State Power Development.

Baglihar is a run-of-river project. The hydro reservoir capacity is 475 million cubic meter. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 3 in number. The penstock diameter is 5.5m. The project generated 4,182 GWh of electricity.

Development status

The project construction commenced in 1999 and subsequently entered into commercial operation in 2008.

Power purchase agreement

Dakshin Haryana Bijli Vitran Nigam and Uttar Haryana Bijli Vitran Nigam are the power offtakers from the project.

Contractors involved

Jaiprakash Associates was selected to render engineering procurement construction services for the Baglihar (Baglihar Phase - I).

Baglihar (Baglihar Phase - I) is equipped with Andritz Hydro francis turbines. The phase consists of 3 turbines with 150MW nameplate capacity.

Baglihar (Baglihar Phase -II) is equipped with Andritz Hydro francis turbines. The phase consists of 3 turbines with 151MW nameplate capacity.

Voith Hydro Holding supplied 3 electric generators for the Baglihar (Baglihar Phase - I).

Voith Hydro Holding supplied 3 electric generators for the Baglihar (Baglihar Phase -II). The generator capacity is 168 MVA.

For more details on Baglihar, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.