Bang Pakong Power Plant is a 2,084.6MW gas fired power project. It is located in Chachoengsao, Thailand. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 1982. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Bang Pakong Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Electricity Generating Authority of Thailand with a stake of 100%.

It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant run on dual-fuel. The primary fuel being used to power the plant is natural gas. In case of shortage of natural gas the plant can also run on Oil.

Bang Pakong Power Plant (Bang Pakong Power Plant Block I) consists of 4 gas turbines with 60.7MW nameplate capacity.

Bang Pakong Power Plant (Bang Pakong Power Plant Block I) consists of 1 steam turbine with 137.5MW nameplate capacity.

Bang Pakong Power Plant (Bang Pakong Power Plant Block II) consists of 4 gas turbines with 60.7MW nameplate capacity.

Bang Pakong Power Plant (Bang Pakong Power Plant Block II) consists of 1 steam turbine with 137.5MW nameplate capacity.

Bang Pakong Power Plant (Bang Pakong Power Plant Block III) consists of 1 steam turbine with 99MW nameplate capacity.

Bang Pakong Power Plant (Bang Pakong Power Plant Block IV) consists of 1 steam turbine with 99MW nameplate capacity.

Development status

The project got commissioned in 1982.

Contractors involved

Marubeni and Siemens were selected to render engineering procurement construction services for the Bang Pakong Power Plant (Bang Pakong Power Plant Block V).

Bang Pakong Power Plant (Bang Pakong Power Plant Block III) is equipped with GE Power MS9001E gas turbines. The phase consists of 2 gas turbines with 104MW nameplate capacity.

Bang Pakong Power Plant (Bang Pakong Power Plant Block IV) is equipped with GE Power MS9001E gas turbines. The phase consists of 2 gas turbines with 104MW nameplate capacity.

Bang Pakong Power Plant (Bang Pakong Power Plant Block V) is equipped with Siemens SGT-1000F gas turbines. The phase consists of 2 gas turbines with 230MW nameplate capacity.

Bang Pakong Power Plant (Bang Pakong Power Plant Block V) is equipped with Siemens SST-4000 steam turbine. The phase consists of 1 steam turbine with 250MW nameplate capacity.

Siemens supplied electric generator for the Bang Pakong Power Plant (Bang Pakong Power Plant Block V).

John Cockerill Group supplied steam boiler for the Bang Pakong Power Plant (Bang Pakong Power Plant Block III).

John Cockerill Group supplied steam boiler for the Bang Pakong Power Plant (Bang Pakong Power Plant Block IV).

Doosan Enerbility supplied steam boiler for the Bang Pakong Power Plant (Bang Pakong Power Plant Block V).

For more details on Bang Pakong Power Plant, buy the profile here.

This content was updated on 4 January 2024

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.