The Batangas Combined Cycle Power Plant is 1,100MW gas fired power project. It is planned in Calabarzon, Philippines. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the permitting stage. It will be developed in a single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2026. Buy the profile here.
Description
The project is being developed by Batangas Clean Energy. The project is co-owned by ENEX Energy and Gen X Energy, with their respective ownership stake of 50% each.
It is a Combined Cycle Gas Turbine (CCGT) power plant. The power plant can run on dual-fuel. The primary fuel being used to power the plant will be natural gas. In case of shortage of natural gas the plant will run on Hydrogen.
The project cost is expected to be around $1,078.572m.
Development status
The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2026.
For more details on Batangas Combined Cycle Power Plant, buy the profile here.
About Batangas Clean Energy
Batangas Clean Energy Inc (Batangas ) is a power generation company which generate electricity through fossil fuel. The company is located in Philippines.