Batman is a 198MW hydro power project. It is located on Batman river/basin in Batman, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1986 and subsequently entered into commercial operation in 2003. Buy the profile here.

Description

The project is currently owned by Elektrik Uretim.

The project generated 483 GWh of electricity.

The hydro power project consists of 1 turbine with 6.1MW nameplate capacity.

The hydro power project consists of 3 turbines, each with 65.5MW nameplate capacity.

The project has 1 electric generator installed at the site. The generator capacity is 7 MVA.

The project has 3 electric generators installed at the site. The generator capacity is 75.5 MVA.

Development status

The project construction commenced in 1986 and subsequently entered into commercial operation in 2003.

For more details on Batman, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.