Bear Oak Solar Power Project is a 25MW solar PV power project. It is planned in Delaware, the US. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently at the announced stage. It will be developed in a single phase. The project construction is likely to commence in 2023 and is expected to enter into commercial operation in 2025. Buy the profile here.

Description

The project is being developed by Doral Renewables. Doral USA, Clean Air Generation and Migdal Insurance are currently owning the project having ownership stake of 41.78%, 38.22% and 20% respectively.

Bear Oak Solar Power Project is a ground-mounted solar project.

The project is expected to supply enough clean energy to power 3,700 households. The project cost is expected to be around $40m.

Development status

The project construction is expected to commence from 2023. Subsequent to that it will enter into commercial operation by 2025.

For more details on Bear Oak Solar Power Project, buy the profile here.

About Doral Renewables

Doral Renewables LLC (Doral Renewables) is engaged in engineering, development, and operational expertise of utility scale renewable energy and battery storage projects in the US.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.