Bemposta is a 439MW hydro power project. It is located on Douro river/basin in Braganca, Portugal. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. Post completion of construction, the project got commissioned in 2011. Buy the profile here.
Description
The project was developed by EDP Gestao da Producao de Energia. Engie and Mirova are currently owning the project having ownership stake of 40% and 25% respectively.
Bemposta is a run-of-river project.
Development status
The project got commissioned in 2011.
Contractors involved
Bemposta (Bemposta I) is equipped with GE Renewable Energy francis turbines. The phase consists of 3 turbines with 79MW nameplate capacity.
Bemposta (Bemposta II) is equipped with Andritz Hydro francis turbine. The phase consists of 1 turbine with 202MW nameplate capacity.
GE Renewable Energy supplied electric generator(s) for the Bemposta (Bemposta I). The generator capacity is 78 MVA.
Andritz Hydro supplied 1 electric generator for the Bemposta (Bemposta II).
For more details on Bemposta, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.