Bundang Combined Cycle Power Plant is a 922MW gas fired power project. It is located in Gyeonggi, South Korea. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in multiple phases. The project construction commenced in 1991 and subsequently entered into commercial operation in September 1993. Buy the profile here.

Smarter leaders trust GlobalData

Report-cover

Premium Insights Bundang Combined Cycle Power Plant

Buy the Profile

Premium Insights

The gold standard of business intelligence.

Find out more

Description

The project is currently owned by Korea South-East Power with a stake of 100%.

It is a CCGT with Cogen power plant that is used for Peakload. The power plant run on dual-fuel. The primary fuel being used to power the plant is liquefied natural gas. In case of shortage of liquefied natural gas the plant can also run on Diesel.

Development status

The project construction commenced in 1991 and subsequently entered into commercial operation in September 1993.

Contractors involved

Hyundai Engineering was selected to render engineering procurement construction services for the gas fired power project.

Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block I) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 185MW nameplate capacity.

Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block I) is equipped with GE Power GT11NM gas turbines. The phase consists of 5 gas turbines with 77.8MW nameplate capacity.

Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block II) is equipped with GE Power steam turbine. The phase consists of 1 steam turbine with 115MW nameplate capacity.

Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block II) is equipped with GE Power GT11NM gas turbines. The phase consists of 3 gas turbines with 77.8MW nameplate capacity.

GE Power supplied electric generator for the Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block I).

GE Power supplied electric generator for the Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block II).

GE Power supplied steam boiler for the Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block I).

GE Power supplied steam boiler for the Bundang Combined Cycle Power Plant (Bundang Combined Cycle Power Plant Block II).

For more details on Bundang Combined Cycle Power Plant, buy the profile here.

Premium Insights

From

The gold standard of business intelligence.

Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.