Buyukduz is a 70.8MW hydro power project. It is located on Dogankent river/basin in Gumushane, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in 2012. Buy the profile here.
Description
The project is currently owned by Ayen Enerji.
Buyukduz is a run-of-river project. The gross head and net head of the project are 507.24m and 488.51m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 1 in number. The penstock length is 1,677m. The penstock diameter is 2m. The project generated 192 GWh of electricity.
Development status
The project got commissioned in 2012.
Contractors involved
GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 2 units of pelton turbines, each with 35.422MW nameplate capacity.
GE Renewable Energy supplied 2 electric generators for the project.
For more details on Buyukduz, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.