Camlica I is an 84MW hydro power project. It is located on Zamanti river/basin in Kayseri, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 1995 and subsequently entered into commercial operation in 1998. Buy the profile here.
Description
The project is currently owned by Elektrik Uretim.
The gross head and net head of the project are 331m and 295m respectively. The penstock length is 914m. The project generated 357.69 GWh of electricity.
The hydro power project consists of 3 turbines, each with 28MW nameplate capacity.
The project has 3 electric generators installed at the site. The generator capacity is 31.5 MVA.
Development status
The project construction commenced in 1995 and subsequently entered into commercial operation in 1998.