Campos Novos is an 880MW hydro power project. It is located on Canoas river/basin in Santa Catarina, Brazil. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. The project construction commenced in 2001 and subsequently entered into commercial operation in 2006. Buy the profile here.
Description
The project is currently owned by Campos Novos Energia with a stake of 100%.
Campos Novos is a reservoir based project. The hydro reservoir capacity is 1,471,000 million cubic meter. The gross head and net head of the project are 185m and 175.6m respectively. The total number of penstocks, pipes or long channels that carry water down from the hydroelectric reservoir to the turbines inside the actual power station, are 3 in number. The project generated 3,310 GWh of electricity.
Development status
The project construction commenced in 2001 and subsequently entered into commercial operation in 2006.
Contractors involved
MOVER Participacoes was selected to render engineering procurement construction services for the hydro power project.
GE Renewable Energy was selected as the turbine supplier for the hydro power project. The company provided 3 units of francis turbines, each with 293.3MW nameplate capacity.
GE Renewable Energy supplied 3 electric generators for the project. The generator capacity is 311 MVA.
For more details on Campos Novos, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.