Can Steam Turbine Power Plant is a 320MW coal fired power project. It is located in Canakkale, Turkey. According to GlobalData, who tracks and profiles over 170,000 power plants worldwide, the project is currently active. It has been developed in a single phase. Post completion of construction, the project got commissioned in July 2006. Buy the profile here.

Description

The project is currently owned by Elektrik Uretim.

It is a Steam Turbine power plant.

The project cost is $808.653m.

Development status

The project got commissioned in July 2006.

Contractors involved

GE Power was selected to render engineering procurement construction services for the coal fired power project.

GE Power was selected as the turbine supplier for the Coal fired project. The company provided 2 units of Single Reheat Tandem Compound Impulse Type steam turbines, each with 160MW nameplate capacity.

GE Power supplied Topack Air-cooled electric generator for the project.

GE Power supplied Topack Air-cooled electric generator for the project.

GE Power supplied steam boiler for the project.

GE Power supplied steam boiler for the project.

For more details on Can Steam Turbine Power Plant, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Power Intelligence Center, which provides detailed profiles of over 170,000 active, planned and under construction power plants worldwide from announcement through to operation across all technologies and countries worldwide.